ROYAL PARK @ CIPULIR KEBAYORAN BARU
•Total Area: 5.2 Ha
•The only lush green residential resort with 75% GREEN AREA in Kebayoran
•Strategic location
•Easy access:
-Tendean–Blok M –CipulirFlyover Development (2014 –2016)
-Elevated BuswayDevelopment, walking distance to BuswayShelter
•±5 minutes to KebayoranLama Railway Station
•±10 minutes to reputable national & international school/university (BINUS Int’l, etc.)
•±10 minutes to GandariaCity, SenayanCity, SenayanNational Golf Club
•±15 minutes to SCBD, PondokIndah Mall & Waterpark
•±15 minutes to RS Pertamina, RS PondokIndah
•±20 minutes to TB Simatupang
Welcomes you with a shady boulevard (75% green area)
The Urban Open Space
Bicycle and pedestrian path from the front gate to residential area
TYPE OF UNITS :
Type A (STUDIO)
SG: 32 m2
Nett: 27 m2
Type B (STUDIO)
SG: 33 m2
Nett: 28 m2
Type C (2 BR)
SG: 67 m2
Nett: 58 m2
Type D (2 BR)
SG: 73 m2
Nett: 63 m2
Type E (3 BR)
SG: 94 m2
Nett: 81 m2
VALUE-ADDED FEATURES
MATV
One TV outlet in living room and master bedroom
COMMUNICATION
One direct telephone line installed per unit, one outlet in living room, one outlet internet broadband
SAFETY DEVICES
Water sprinkler, fire alarm, hydrant system, UL/FM fire pumps system, and refugee floor on 21stfloor
INTERCOM
Video phone and TV picture
KITCHEN
Cabinets with stainless steel sink and gas stove, hood and oven (Teka/equal)
WARDROBE
Built in wardrobe to all bedrooms
AIR CONDITIONING
Split unit system to all bedrooms and living room
SECURITY SYSTEM
CCTV: installed at main public entrance and every access point
Access Card System: proximity system for vehicular access to basement parking and common lift lobby
CAR PARK
One dedicated parking lot for 2 bedroom & 3 bedroom type level of basement
PAYMENT SCHEME*
A. CASH
-30% 1x25 juta/m2
-70% 6x
B. CASH BERTAHAP
-Flat 12x27 juta/m2
-Flat 24x30 juta/m2
-Flat 36x33 juta/m2
C. KPA
-DP 30% 24x + KPA/cash30 juta/m2
-DP 30% 36x + KPA/cash33 juta/m2
Range harga25 juta–35 juta/m2(exclude PPN)
*) Prices may be changed at any time without further notice
PROJECT TIMELINE
GRAND LAUNCHING
August 2015
GROUND BREAKING
December 2015
HAND OVER
December 2018
•Total Area: 5.2 Ha
•The only lush green residential resort with 75% GREEN AREA in Kebayoran
•Strategic location
•Easy access:
-Tendean–Blok M –CipulirFlyover Development (2014 –2016)
-Elevated BuswayDevelopment, walking distance to BuswayShelter
•±5 minutes to KebayoranLama Railway Station
•±10 minutes to reputable national & international school/university (BINUS Int’l, etc.)
•±10 minutes to GandariaCity, SenayanCity, SenayanNational Golf Club
•±15 minutes to SCBD, PondokIndah Mall & Waterpark
•±15 minutes to RS Pertamina, RS PondokIndah
•±20 minutes to TB Simatupang
Welcomes you with a shady boulevard (75% green area)
The Urban Open Space
Bicycle and pedestrian path from the front gate to residential area
TYPE OF UNITS :
Type A (STUDIO)
SG: 32 m2
Nett: 27 m2
Type B (STUDIO)
SG: 33 m2
Nett: 28 m2
Type C (2 BR)
SG: 67 m2
Nett: 58 m2
Type D (2 BR)
SG: 73 m2
Nett: 63 m2
Type E (3 BR)
SG: 94 m2
Nett: 81 m2
VALUE-ADDED FEATURES
MATV
One TV outlet in living room and master bedroom
COMMUNICATION
One direct telephone line installed per unit, one outlet in living room, one outlet internet broadband
SAFETY DEVICES
Water sprinkler, fire alarm, hydrant system, UL/FM fire pumps system, and refugee floor on 21stfloor
INTERCOM
Video phone and TV picture
KITCHEN
Cabinets with stainless steel sink and gas stove, hood and oven (Teka/equal)
WARDROBE
Built in wardrobe to all bedrooms
AIR CONDITIONING
Split unit system to all bedrooms and living room
SECURITY SYSTEM
CCTV: installed at main public entrance and every access point
Access Card System: proximity system for vehicular access to basement parking and common lift lobby
CAR PARK
One dedicated parking lot for 2 bedroom & 3 bedroom type level of basement
PAYMENT SCHEME*
A. CASH
-30% 1x25 juta/m2
-70% 6x
B. CASH BERTAHAP
-Flat 12x27 juta/m2
-Flat 24x30 juta/m2
-Flat 36x33 juta/m2
C. KPA
-DP 30% 24x + KPA/cash30 juta/m2
-DP 30% 36x + KPA/cash33 juta/m2
Range harga25 juta–35 juta/m2(exclude PPN)
*) Prices may be changed at any time without further notice
PROJECT TIMELINE
GRAND LAUNCHING
August 2015
GROUND BREAKING
December 2015
HAND OVER
December 2018